Keep and skim
Where the background is sound and suitable, preparation and a finish skim can refresh rooms without unnecessary stripping.
Plastering Service London · Specialist services
Planning a whole-property renovation? Understand how walls and ceilings are assessed, how room-by-room plastering is organised and what affects the price and timescale.
Whole-house plastering rarely means the same treatment everywhere. A survey may find sound walls needing a skim alongside loose plaster, old repairs and ceilings that need boarding.
Where the background is sound and suitable, preparation and a finish skim can refresh rooms without unnecessary stripping.
Localised damage around openings, cracks or removed fixtures may be made good before the finishing coat.
Severely defective backgrounds may need more extensive work. The quote should identify which rooms need it and why.
Coordinating with electricians, plumbers, carpenters and decorators can save repeated damage to finished surfaces.
Complete chasing, pipe alterations, framing and other disruptive work before final plastering wherever possible.
High walls, tight turns and stair protection can change the equipment and labour needed compared with ordinary bedrooms.
Agree which rooms must remain usable, where materials can be stored and whether work will be phased around occupants.
Ask for an itemised schedule rather than comparing two totals that may describe very different jobs.
List each room and whether the walls, ceiling or both are included; note any excluded cupboards or utility spaces.
Identify wallpaper removal, bonding, loose plaster removal, crack reinforcement and corner beads where applicable.
Clarify whether the quotation includes making good around sockets and skirtings, waste disposal and when decorating can begin.
Send your floor plan or room list and photographs of the walls and ceilings. We can discuss preparation, sequencing and an itemised scope.
Whole-house quoteSometimes, after checking the paint and substrate are sound and using appropriate preparation.
Not necessarily. We assess each ceiling and recommend work only where needed.
Electrical first-fix and other disruptive services should normally be completed before final plaster finishes.
Wait until plaster is fully dry and follow the recommended decoration system; drying time varies.
Tell us which rooms or surfaces need work, and send photographs where possible. We can discuss the suitable preparation and provide a quotation for the agreed scope.
Request your quotation →